In LW4 the order of the steps to are not affected. E.g. I generate Gcode for Laser Raster and laser cut - always cutting will made first. I can move the raster job up or down (first position or last position). Laser cut is always made before.
And if I save a jason file. Feed rate will be lost after reopen.