So I’ve finally got some time to start my Eustathios build and need to start putting all the parts together. Couple of questions for those of you who have already built yours.
From the photos on YouMagine I can’t quite see where the motors are all mounted, are they contained within the build chamber or are they all in the lower section? I only ask because I’d really like to fully enclose the build area and heat it up for good ABS printing and would rather my steppers don’t have to live through that heat.
Also I’ve been going over the BOM, and it seems there are still some parts we have to order from RobotDigg, but their shipping is kind of horrendous last time I ordered from them. I think I have enough GT2 belt, and I have a whole load of these misumi LMU-N8 bearings (http://us.misumi-ec.com/vona2/detail/110300026540/?HissuCode=LMU-N8&ProductCode=LMU-N8&Tab=wysiwyg_area_3) do you think these will work with the standard parts? And is there anywhere else I can get the 10mm bore 32 tooth gt2 pulleys?
Finally, is anyone out there printing these parts in ABS/Nylon? Would love to buy a set as I don’t think I can get good enough quality ABS prints out of our shoddy i3 at work.
